Size the pump from the line conditions, not the catalogue. The nine-field enquiry below is written by the duty you enter.
Last-project duty is a reasonable starting point; the sheet rewrites it against the conditions you enter. No model and no OEM — family shortlist, an estimate, and the enquiry.
Families: industrial pumps. Duty-point cost: small equipment failures.
engine check: …
Worksheet
Inputs left. Live duty right. The specification beneath is the same document — it is composed from these numbers, not typed afterwards. Switching paths enriches the sheet; it does not wipe it.
Line conditions
If you have suction and discharge pressure instead of head, enter both — head is converted. NPSHa is a system number. NPSHr is not invented; it lives on the manufacturer’s curve.
Size from the line conditions, not the nameplate. Last-project duty is a reasonable starting point — the sheet rewrites it against current conditions. Enquiry is a re-spec, not a like-for-like replacement. Assessment frame: ISO 14414.
Hydraulics, materials and seals selected for the fluid, not just the flow rate. This path writes questions into the enquiry — it does not name a certified steel grade.
Example is illustrative only — not a named plant.
Result · live
Family —
No BEP from this sheet — a BEP is a curve figure we do not have.
USD — · 2026 conditions, ~130 KES/USD
Standards —
First-pass filter for the enquiry — the language already on the pumps page. Confirm with manufacturer compatibility data. Grade not named until the medium data sheet is attached.
Auto-composed from the duty above
These nine fields are not a blank form. They rewrite as you size. Edit a line if you need to; otherwise send it as composed.
| 1 Job | |
|---|---|
| 2 Hydraulic duty | |
| 3 Process medium | |
| 4 Family shortlist | |
| 5 Hydraulics / BEP / off-duty | |
| 6 Connections / seal | |
| 7 Materials | |
| 8 Certification / standards | |
| 9 Maintenance |
Estimate for enquiry, not a certified OEM sizing. It does not name a steel grade and it is not a pump curve. Confirm with manufacturer software and the duty on site before a purchase order. Related article: small equipment failures (duty-point cost).
ISO 2858 · ISO 5199 · ANSI/ASME B73.1 · API 675 · API 676 · ISO 9906 · ISO 14414
Published off-duty envelope, mid-sized East African plant, 2026, ~130 KES/USD: USD 4–23k / KES 0.5–3M · Not OEM-certified sizing · No model is selected.